New Technology Solves Aftermarket Parts Problems

Mapping and testing ensure proper fit and function of replacement parts.

Written by:
Dr. T. Ravisundar and Dibu Chowdhury, HydroAire Inc., and Heinz P. Bloch, P.E., Process Machinery Consulting
Published:
February 28, 2014

Industrial equipment users are often confronted with pump parts issues. Handling these issues requires making experience-based decisions and prioritizing. How pump hydraulic and wear components in existing inventory are treated is an issue that merits consideration. Plant size, age, past purchasing, maintenance and storage-related practices are among the factors that affect a facility’s status with respect to operational readiness and downtime risk.

As these generally-known facts are applied on a pump component level, it is often determined that the specific pump components in the storehouse may not be the same as the components currently operating in a particular process centrifugal pump. Nor is it always the case that truly optimized components are presently installed. Therefore, the risk of unforeseen downtime can be reduced by having the right parts on hand. If the parts are truly optimized, installing them at the next opportunity will take the facility beyond being back in business—it will actually take the equipment owners to greater profitability.

To ensure that pumps will perform their intended functions, inventoried or stocked parts should be thoroughly inspected and corrected as needed prior to installation. Incoming inspection is practiced by best-of-class equipment owners and only verified-as-correct parts will be placed in the storehouse. This case study examines a real-life scenario and demonstrates essential precautions that can be taken when procuring pump hydraulic and wear components.

A Condensate Pump Repaired & Improved

During a planned outage, a nuclear power plant (NPP) sent a three-stage condensate pump to a highly experienced service center with hydraulic pump design engineers on staff. The NPP provided the hydraulic components, wear rings and bearings from its stock inventory for the pump rebuild project. The hydraulic pump design engineers at the service center performed a thorough inspection of both the disassembled rotor and the parts supplied by the NPP. A visual inspection quickly revealed that the geometry of the replacement impellers did not match the impellers that were removed from the disassembled pump (see Figure 1).

Cross-section of a three-stage pumpCross-section of a three-stage pump created by an experienced pump repair facility for this three-stage pump. Note semi-open impellers in stages two and three. Source: Hydro Inc., Chicago, Ill.

First Mapping, then Comprehensive Engineering Analysis

Figures 1 through 6 are examples of the extensive mapping of before versus after conditions of virtually all components of this condensate pump. The service center hydraulic pump design engineers performed comprehensive engineering analyses which overlapped and intermeshed the mappings. In this instance, the analyses included three-dimensional (3-D) modeling using late edition ANSYS software.

First-stage impeller vane conditionFigure 2. Vane condition, first-stage impeller. Source: Hydro Inc., Chicago, Ill.
First-stage impeller vane conditionFigure 3. Vane condition, first-stage impeller. Source: Hydro Inc., Chicago, Ill.

Restoring the Impellers

The service center engineers’ comprehensive engineering analysis determined that using the replacement impellers would alter the pump’s hydraulic performance. Therefore, the service center proposed suitable modifications to each of the three stages. On the spare suction impeller, the modifications included profiling the vane inlet to increase the throat area, enlarging the suction eye diameter and tapering the vane outlet to correct the protrusions shown in Figures 2 and 3. The proposed modifications for the intermediate-stage impellers included the proper profiling of the vane outlet in addition to trimming and “underfiling” the diameters to the appropriate dimensions. With the NPP’s approval, the service center made the modifications and polished the flow passages to improve the hydraulic performance of each spare impeller.

First-stage impellersFigure 4. First-stage impeller from three-stage pump (left) and from owner’s inventory (right). Source: Hydro Inc., Chicago, Ill.

Wear Rings & Bearings

The service center’s in-house engineering team evaluated the wear rings and bearings supplied by the NPP’s store room. Next, the NPP was informed of the component discrepancies and that the dimensions of as-supplied spare parts would not meet sound acceptance criteria.

Figure 5. Overlapping of 3-D models for engineering review. Source: Hydro Inc., Chicago, Ill.

The pump owner’s and the service center’s engineers reviewed the reasons the service center advocated proper wear ring dimensions and how deviations would prevent this pump from performing as intended. The NPP concurred and asked the service center to manufacture new wear rings with proper running clearances.