Repairing multistage, segmental diffuser, boiler feed pumps and maintaining the original performance can be difficult and challenging. In this case study, a comprehensive inspection and repair program was applied to rebuilding six boiler feed pumps to improve MTBR and hydraulic performance to meet system demands.

Background

The pumps sent for rebuilding played an important role in maintaining plant performance for one of the six largest wastewater treatment plants in the United States, located in northeastern New Jersey. The plant, operated by the Passaic Valley Sewerage Commissioners (PVSC), uses the boiler feed pumps in a wet air oxidation (WAO) process.

The WAO process treats combined thickened waste activated sludge and primary sludge with heat (420 deg F) and high pressure (650 psi) for 30 minutes in a reactor to reduce the volatile solids content, break the chemical bond between the solids and the water, facilitate a high degree of dewaterability, sterilize the sludge and minimize the volume to be removed for beneficial reuse.
Insert picture #2: Facility's boiler house

Problem

The boiler feed pumps at this waste treatment facility gradually experienced reduced performance, and the plant needed to run two pumps in parallel to meet the daily requirements. Plant operations and engineering needed a solution where only one pump was needed to meet production needs. Not only would this setup be more efficient, but it would also allow the second pump to act as an emergency backup. These pumps went through a number of repair facilities, and each time the pump was returned to PVSC and put back into service, minimal, if any, performance improvement was noticed. 

Pumps were returned for warranty but PVSC was told that the "pumps were perfect," so the system must be at fault. PVSC incurred downtime, the expense of repairs and the costs incurred by frequently removing and replacing boiler feed pumps.
PVSC was confronted with the possibility of completely scrapping its system. It changed valves and checked piping, pump alignments, etc. but could not find a system problem. These repair shops were not aware of this type of pump's sensitivity and the consequent difficulty involved in performing a sustainable, long term repair.

Benefits of a Comprehensive Inspection

PVSC approached another pump repair shop with the requirement of improving MTBR and restoring hydraulic performance to meet system demand. Unlike the other service centers, this service center invested considerable time and effort in performing a comprehensive inspection of all components that are critical to the operation of multistage segmental diffuser pumps, including:

  1. Hydraulic review of impeller and diffuser components for optimizing efficiency, improving hydraulic stability and achieving desired performance.
  2. Material compatibility review with the pumpage for corrosion and erosion reduction, which is especially important in the high velocity areas of the impellers, diffusers and balance drum.
  3. Review pump rotor to stationary dimensional alignment to maintain hydraulic stability and prevent hydraulic-induced vibration. For this type of pump, rotor centralization of the impeller to the diffuser is important as it is 10 stages.
  4. Review of rotor mechanical dimensional fits to prevent assembled looseness and reduce vibration.
  5. Review of diffuser dimensional integrity for leakage problems with the stacked diffusers.

Inspection Report: Findings and Corrections

Bearings

The pump turned freely when it was received. While dismantling the pump's thrust end, the service center found a portion of the bearing cage in the housing. The thrust bearings mounted on the shaft were intact; therefore, this piece of cage was from a previous failure. On one pump, the back to back thrust bearings were installed incorrectly, which resulted in a short run to failure. All bearings were installed correctly with the proper clearances and tolerances as recommended by the bearing manufacturer.
Insert Picture # 4: Bearing cage from a previous repair
Clearances
The running clearance at the eye side of the impellers was 10 to 30 percent over design and 70 to 90 percent over on the inter-stage sleeves to the diffuser bushings. The balance drum to liner clearance was 25 percent over design. These over tolerance dimensions contributed to a significant performance reduction causing two pumps to be run instead of just one, increasing the power consumption to maintain system performance. Wear ring clearances were brought back to acceptable tolerances typical of the application and materials.

Shaft

Dimensionally, the shaft was out of tolerance. Both bearing fits were undersized, and several of the impeller and sleeve fits were fretted. The first stage impeller keyway was deformed. The run out inspection found a 0.008 in TIR as a simple bow. The pump shaft was replaced and the tolerances between the impeller bores and pump shaft was tightened up to current repair practices.
Insert Picture # 5: Deformed keyway on pump shaft

Impellers

Several impeller entrance and exit vane tips required restoration for proper hydraulic profile. There were excessive running clearances at the eye side wear rings. Several bores were out of tolerance and restored to proper dimensions. All mounted wear rings were skim cut to a common size, concentric with the bores.
Each impeller was individually balanced to 2W/N and then the entire rotor was balanced to 2W/N. This procedure increases MTBF due to vibration reduction.