How to Prolong Your Water Pump’s Life Case Study
When Duke Energy Brunswick needed seawater pumps to outlast in low flow conditions, Greene Tweed’s AR-HT bearings delivered.
Sponsored by: Greene Tweed

Learn how Duke Energy Brunswick enabled bearing survival in low flow bearing flush conditions on their Flowserve Circulating Water Intake Pumps (CWIP) working in seawater to over 15 minutes (up from two minutes earlier) by upgrading to Greene Tweed’s AR-HT bearings.

Additionally, in operation the pump vibration levels are consistently low, and testing proved that the AR-HT bearings can resist wear and maintain clearances far greater than the incumbent material.

That’s not all. They have not required significant maintenance to date—seven years and counting!

Fill out the form on this page to download this case study.

Sponsored by:

Greene Tweed

This case study is provided by both Pumps & Systems and the sponsor who may follow up with you regarding their products and/or services. Please complete the form below to download this case study.

Who will control my data?
Cahaba Media Group and the sponsor will control your data.

What data are we collecting?
This form collects your name, your company name, your email address, your job title, your country, your state, and your IP (computer) address.

How will we use this information?
The information you provide may be shared with the Pumps & Systems partner sponsoring this content, so that they can follow-up with additional information regarding their products and services. For more information, please visit our Privacy Policy.